Congratulations to all our design team for their contribution to the RGT2 Project. Whessoe designed the LNG tanks and AFW designed the balance of plant and jetty.
The projects design HQ was based in Kuala Lumpur, located in the Citi Bank tower, just a short stroll from the PETRONAS Towers.
The Whessoe design team, comprising of civil, structural, mechanical, process, technical service, piping, electrical, instrument and control engineers were based in Darlington at Whessoe's HQ.
I travelled continuously between the two locations, providing the interface and co-ordination of the design development, attending P&ID reviews, HAZID and 3D Model Reviews through the full design cycle.
Our colleagues in Samsung provided the full EPC service, from design through to construction where the pictures above show the success of the project, delivered within budget and on time.
The client has now signed off the acceptance certificate for the project, so its a very proud moment for us all.
Garry Turnbull, Project Engineering Manager, Whessoe Engineering.
+44 7932 664159.
Comments
Post a Comment