It's always great to see your hard work come to fruition.
The rock and barge have arrived from Oman and the Breakwater grows day by day.
The dredging around the Offshore Jetty area has started and the Temporary Jetty attached to the onshore landing area is in full swing.
All those meetings on Navigation Studies, Sedimentation Reports, Breakwater Modeling and Material Logistics finally bare fruit.
I hope the construction team get the drone camera up and running soon, the photo's should be great.
Garry T. +447932 664159.
Comments
Post a Comment